We’re making key upgrades across the Leisureplexes to enhance your experience. While there will be some short-term disruption, we’re committed to keeping you supported and informed throughout.

We’re moving closer to the completion of works at Cannington Leisureplex, with a site inspection taking place next week to confirm the official reopening date for the public.

At Riverton Leisureplex, completion dates will be confirmed shortly, as we are currently waiting on the final sign offs for the power installations that will operate the new air conditioning systems in the Wellness Suite.

Current works

At Cannington, we are busy with the final touches, including:

  • Mirror installations
  • Accessories (signage, Shower heads)
  • Door finishings
  • Drinking fountains
  • Skirting boards
  • Cleaning

At Riverton, we are working on the tiling in the female change rooms and work will continue in the gym changerooms.

Please note, the gym changerooms and toilets will be closed until the end of October, with portable showers and toilets available in the Riverton Courtyard. Speedo-style deck coats will be available below wholesale cost for those preferring to head home without showering (members only).

Coming up

Pool deck hot water upgrade – following gym works

We’ll install a new hot water system for the male and female pool deck showers at Riverton Leisureplex.

  • Male pool showers and toilets will close for up to 2 weeks while we connect new pipework.
  • Heat pumps will be installed in the Leisure BBQ area.

Air conditioning upgrades – from late September

  • Upgrades will be made to the air conditioning at Riverton Leisureplex in:
    • Reception
    • Bill Cole Room
    • Fitt Factory
  • Works expected to begin around 22 September 2025 and will be staged to minimise disruption.
  • A detailed plan will be shared once confirmed with contractors.

The gym, pools, swim school, aqua classes, and all other core services at Riverton Leisureplex will continue to operate during this period, with only the spaces listed above temporarily impacted.

We understand this may cause inconvenience and appreciate your patience. All upgrades are designed to have us fully refreshed and ready for a great summer season. If these disruptions affect your routine, you can suspend your membership at no cost during the impacted periods.

Updates

We are getting close to completing our renos at Cannington Leisureplex, with the Pool Deck on track for completion in early September. Once finished, we will carry out detailed cleaning and final checks before we open to  the public. Keep an eye on this space or our socials for the reopening date.

At Riverton Leisureplex, works are progressing well, and we expect to have the final completion dates confirmed in the coming weeks.

Looking ahead, in the next two weeks we will be working on:

Riverton Leisureplex

  • waterproofing of the showers
  • flooring
  • door installations
  • vinyl installs
  • installing tiles
  • water heating system installation
  • starting work on the gym changerooms.

Cannington Leisureplex

  • hoist installation
  • mirrors
  • adult change table installation
  • doors and accessories
  • first aid room cabinets
  • painting touch ups
  • signage installation
  • pre-completion inspections.

The Leisure Renovations are looking great, with the tiling going up in the Male and Female changeroom at Cannington Leisureplex. 

At Riverton Leisureplex, we have been working on the grouting in the Spa and have installed a much-needed new air-conditioning unit in the Wellness Area. 

Looking ahead, we will be working on the following over the next two weeks:

Cannington Leisureplex

  • Complete tiling and grouting
  • Finish Painting
  • Install lighting and Fire sensors
  • Install toilets and urinals
  • Ceiling Hoists installation
  • Vinyl flooring

Riverton Leisureplex

  • Painting
  • Cutting for light fixtures
  • New power supply installation
  • Ceiling and wall finishing
A collage of the updates described above

Our Leisureplexes are really starting to take shape and we are shifting from demolition work to installations, meaning that many of the spaces are starting to look more like their final forms.  

Over the next few weeks, we will be working on the following: 

Riverton Leisureplex

  • Painting
  • Window flashings
  • Airconditioning fittings for Wellness

Riverton Leisureplex Wellness Pools and Plant

  • Program Myrtha pool liner final prep and install
  • Balance Tank pressure testing and epoxy coatings
  • Sauna wooden seating recoating / sealing
  • Steam / sauna tiling repairs and grouting

Cannington Leisureplex

  • Tiling of pool concourse
  • Final ceiling and walls sanding
  • Painting
  • Final plastering
  • Hoist installations

Work is progressing well at our Leisureplexes, with the ceiling and lights having been completed in the Riverton Leisureplex Wellness Suite, opening the way for us to start work on the Program Pool.

At the Cannington Leisureplex, we are seeing great progress on the pool deck wall, the deck showers, and the male, female and accessible changerooms.

Cannington Leisureplex - showing the pool deck wall and deck showers.
Cannington Leisureplex - showing the pool deck wall and deck showers.
Riverton Leisureplex Wellness Suite.
Riverton Leisureplex Wellness Suite.

Refurbishment works at the Riverton and Cannington Leisureplexes are progressing according to schedule, and the renovations are really starting to take shape.

Over the next fortnight, contractors will be working on the following:

Riverton Leisureplex

  • Plumbing
  • Painting
  • Mechanical works
  • Installation of lights
  • Framing and glazing of the Wellness window
  • Grinding walls
  • Ceiling panels
  • Lining of walls

Cannington Leisureplex

  • Mechanical works
  • Electrical works
  • Flashings
  • Ceiling works
  • Wiring
  • Plastering
A collage of refurbishment progress at the Leisureplexes
Renovations update for Riverton Leisureplex.

We have seen significant progress in the renovation areas at both Leisureplexes, with the following work scheduled to begin over the next two weeks:

Riverton Leisureplex

  • Mechanical ductwork to Female changeroom
  • Courtyard Block wall outside of Wellness area
  • Concrete filling
  • Wellness ceiling framing

Cannington Leisureplex

  • Wall framing
  • Plumbing
  • Concrete filling
  • Demolition
A collage of refurbishment progress at Cannington Leisureplex
Cannington Leisureplex
A collage of refurbishment progress at Riverton Leisureplex
Riverton Leisureplex

Renovations at the Cannington and Riverton Leisureplexes are progressing well. It has been a busy and noisy two weeks, as most of the project areas have been undergoing demolition in preparation for the next stage. 

The images below highlight the progress of the Riverton Wellness HVAC works, including the installation of ducting and the development of the outdoor compound.

A collage showing the works at Riverton Leisureplex

Renovations are progressing on schedule, and over the next fortnight we will be working on the following:

Cannington and Riverton Leisureplexes

  • Demolition
  • Plumbing pre-lay
  • Electrical rough in
  • Mechanical demolition
  • Mechanical ductwork

These works involve heavy equipment being used, so we will continue to experience construction noise.

Clockwise: 3 photographs showing the refurbishment works at Riverton; 2 photographs of the works at Cannington.
Clockwise: 3 photographs showing the refurbishment works at Riverton; 2 photographs of the works at Cannington.

We are into the second week of the Leisureplex renovations and things are tracking well. Contractors have completed:

Cannington and Riverton Leisureplexes

  • Site possession completed.
  • Hoardings have been erected.
  • Site setup is complete.
  • Isolations have been set up.
  • Demolition works have begun.
  • Plumbing pre-lay has commenced.

Riverton Leisureplex Wellness Suite

  • Pools and balance tanks have been drained.
  • Program pool liner has been removed.
  • Chemical storage has been emptied.
  • Asset inspections have been completed.

In February 2025, the City of Canning commenced renovations to the Cannington and Riverton Leisureplexes, making major improvements to the popular community facilities that welcome over 1.5 million visitors per year.

These are the first major renovations for the leisure centres, which are now over 20 years old, and will ensure that our centres retain their position as modern and welcoming fitness and recreational centres that serve City of Canning residents and visitors.

The works are expected to run from February through to September, and the City will endeavour to keep disruptions to services and customers to a minimum.

Areas affected by the renovations

Riverton Leisureplex

  • The Wellness Suite will be closed from 3 February to September. During this time, we will be replacing tiling, grouting, spa blowers and jets in the spa pool, and the program pool filter and liner. We will also be refurbishing the Accessibility changerooms and installing a new, improved HVAC system.
  • The Aquatics Women’s and Family changerooms will be closed from 3 February to September for major renovations, including the addition of a new family/accessibility changeroom, showers and change cubicles. Customers can use the changerooms at the gym, Bill Cole Function Centre and F.I.I.T. Factory.

Cannington Leisureplex

  • The Male, Female and Accessible Changerooms adjacent to the pool will be closed from 3 February to July for refurbishment, including the installation of new showers and toilet cubicles. Due to this the Wellness suite will be closed during the week, but will reopen for limited use from Fridays at 4pm to Sundays at 6pm. Customers can use the toilets and changerooms located at the gym.
  • The Concourse area on northern side of the 25-metre pool, from the accessible changerooms to the end of the pool, will be boarded up and access will be limited as we refurbish the tiled wall that had sustained water damage.

Rehab and recovery alternatives while the Wellness Suite is closed

If you rely on the Wellness Suite for rehabilitation, relaxation, or recovery, there are still plenty of great ways to continue your wellness routine:

  • Water-Based Rehab: The Leisure Pool remains open, offering aqua walking, gentle swimming, and hydrotherapy movements to support joint health and recovery. Walking lanes are available in 25m and 50m pools. 
  • Yoga and Pilates Classes: Improve flexibility, core strength, and balance with low-impact movement tailored to rehabilitation needs.
  • Stretch and Mobility Classes: These classes focus on gentle stretching, breathing, and muscle activation, perfect for post-injury recovery.
  • Technogym App Rehab Workouts: Access guided mobility, stretching, and rehab-friendly workouts from home or use Technogym’s connected equipment at our gym. Please check with staff regarding app access with your membership.
  • Low-Impact Gym Options: Consider using the treadmill or recumbent bike for circulation improvement or try foam rolling and self-massage techniques to relieve muscle tension.

Even with the Wellness Suite temporarily closed, there are many ways to stay active, recover, and improve your well-being. We encourage you to explore these alternatives and make the most of everything the Leisureplex has to offer!

We appreciate your patience as we work to enhance your experience. Thank you for being part of our Leisureplex community – we can’t wait to unveil these fantastic upgrades!

Wellness Suite availability

Translated information

Key information about the refurbishments has been made available in these languages: